Member of the CEME Group

Realization of cleanrooms ISO 7 for ARaymondlife's new plant in Saint-Égrève.

araymond life cleanrooms iso7 2

Cleanrooms ISO 7 for ARaymondlife

With its expertise in plastic injection to offer solutions adapted to the healthcare market, ARaymondlife is developing by creating a new 3,700 m² factory in Saint-Égrève on the outskirts of Grenoble.

This new manufacturing unit includes controlled atmosphere workshops for injection, assembly and packaging, as well as laboratories to carry out product tests and quality controls.

VÊPRES has taken charge of the production of twocleanrooms ISO 7 of 225 m² combined with a secondary packaging area of 100 m². An exceptional project in terms of the devices to be implemented: 29 roll-up doors and watertight doors, 37 glazed frames, 1,000 m² of partitions cleanroom, more than 500 m² of false ceilings...

An office area has also been created by the VÊPRES, including 340 m² of partitions and 200 m² of false ceilings, the supply and installation of 9 door sets and 7 glazed frames.

The teams of VÊPRES would like to thank the Araymondlife team for their trust as well as Wazé & Associés (Project Management) for their professionalism throughout the project.

www.araymond-life.com/fr

araymond life cleanrooms iso7 3

cleanrooms under construction

Installation of ceiling panels and supports

araymond life cleanrooms iso7 1

Inside view of one of the cleanrooms ISO 7

Here's a finished one (225m²)

araymond life cleanrooms iso7 2

Local before the installation of the cleanroom

Spotting and dimensioning during the construction phase

For health products

VÊPRES built cleanrooms ISO 7 for ARaymondlife's new plant in Saint-Égrève. This 3,700 m² manufacturing unit includes workshops and laboratories for the injection and assembly of health products. The project included two ISO 7 rooms of 225 m² and a secondary packaging area of 100 m². Vêpres installed 29 roll-up doors, 37 glazed frames and 1,000 m² of partitions cleanroom, as well as offices with 340 m² of partitions and 200 m² of false ceilings.

Contact us!

HELIUP
HELIUP

HELIUP

Very tight deadlines and technical constraints for this project dedicated to the manufacture of photovoltaic panels for HELIUP.

HELIUP
SGH MEDICAL PHARMA
SGH MEDICAL PHARMA

SGH MEDICAL PHARMA

This cleanroom for SGH MEDICAL PHARMA is dedicated to a single customer, a global player in animal health.

SGH MEDICAL PHARMA
ADRAGOS PHARMA
ADRAGOS PHARMA

ADRAGOS PHARMA

Construction of a new production line for ADRAGOS PHARMA, in a constrained environment and without interruption of activity.

ADRAGOS PHARMA
ELOGEN
ELOGEN

ELOGEN

Three projects with a total surface area of 300 m², including an assembly line and a laboratory, have been completed for ELOGEN, a specialist in electrolyzers producing green hydrogen.

ELOGEN
BECTON DICKINSON
BECTON DICKINSON

BECTON DICKINSON

For Becton Dickinson, VÊPRES has created a QCL laboratory in an existing building, on an area of 600 m².

BECTON DICKINSON