Member of the CEME Group

Construction of ISO 7 cleanrooms for ARaymondlife's new plant in Saint-Égrève.

araymond life cleanrooms iso7 2

ISO 7 Cleanrooms for ARaymondlife

Leveraging its expertise in plastic injection to offer solutions tailored to the healthcare market, ARaymondlife is expanding by establishing a new 3,700 m² factory in Saint-Égrève, near Grenoble.

This new manufacturing unit integrates controlled environment workshops for injection, assembly, and packaging, as well as laboratories for conducting product testing and quality control.

VÊPRES undertook the construction of two ISO 7 cleanrooms spanning 225 m², complemented by a 100 m² secondary packaging area. This project was exceptional due to the extensive equipment deployed: 29 roll-up and airtight doors, 37 glazed frames, 1,000 m² of cleanroom partitions, and over 500 m² of suspended ceilings.

An office area was also completed by the VÊPRES teams, comprising 340 m² of partitions and 200 m² of suspended ceilings, along with the supply and installation of 9 door sets and 7 glazed frames.

The VÊPRES teams thank the Araymondlife team for their trust, as well as Cabinet Wazé & Associés (Project Management) for their professionalism throughout the project.

www.araymond-life.com/fr

araymond life cleanrooms iso7 3

Cleanrooms under construction

Installation of ceiling panels and supports

araymond life cleanrooms iso7 1

Interior view of one of the ISO 7 cleanrooms

Here is one completed (225m²)

araymond life cleanrooms iso7 2

Area before cleanroom installation

Identification and dimensioning during the execution phase

For healthcare products.

VÊPRES constructed ISO 7 cleanrooms for ARaymondlife's new plant in Saint-Égrève. This 3,700 m² manufacturing unit integrates workshops and laboratories for the injection and assembly of healthcare products. The project included two 225 m² ISO 7 cleanrooms and a 100 m² secondary packaging area. VÊPRES installed 29 roll-up doors, 37 glazed frames, and 1,000 m² of cleanroom partitions, as well as offices comprising 340 m² of partitions and 200 m² of suspended ceilings.

Contact us!

DIAMFAB
DIAMFAB

DIAMFAB

Complete fit-out of the production site for DIAMFAB, an Isère-based startup specializing in the manufacturing of semiconductor synthetic diamonds.

DIAMFAB
HELIUP
HELIUP

HELIUP

Very tight deadlines and technical constraints for this project dedicated to the manufacturing of photovoltaic panels for HELIUP.

HELIUP
SGH MEDICAL PHARMA
SGH MEDICAL PHARMA

SGH MEDICAL PHARMA

This cleanroom, constructed for SGH MEDICAL PHARMA, is dedicated to a single client, a global leader in animal health.

SGH MEDICAL PHARMA
ADRAGOS PHARMA
ADRAGOS PHARMA

ADRAGOS PHARMA

Construction of a new production line for ADRAGOS PHARMA, within a constrained environment and without interrupting operations.

ADRAGOS PHARMA
ELOGEN
ELOGEN

ELOGEN

Three projects, totaling 300 m² and encompassing an assembly line and a laboratory, were completed for ELOGEN, a specialist in electrolyzers producing green hydrogen.

ELOGEN