Member of the CEME Group

ESIEE Paris / CCIR Paris Ile-de-France

Research Cleanroom ISO 5 ISO 7 and ISO 8

A very large project featuring 650 m² of cleanrooms for an engineering school.

ESIEE Paris cleanrooms engineering school

A very large project featuring 650 m² of cleanrooms for an engineering school.

In partnership with the prime contractor CHABANNE ET PARTENAIRES and the project management assistance VISUEL, our teams participated in the creation of a building housing 650 m² of ultra-clean cleanrooms classified ISO 5, ISO 7, and ISO 8 for ESIEE Paris, an engineering school in Noisy-Le-Grand (93) on the Campus de la Cité Descartes (Université Paris Est Marne-la-Vallée, École Nationale des Ponts Paris Tech, Institut français des sciences et technologies des transports, de l’aménagement et des réseaux, etc.).

Discover the cleanroom project with video on the ESIEE Paris website.

This project spanned very large areas and involved highly demanding technical specifications: the construction of 650 m² of cleanrooms, including the installation of sheet metal false ceilings and 550 m² of filtering false ceilings (dry grid) with FFUs, exhaust shafts, secondary framework, and sealing skirts. A plenum was also installed above the grid, featuring side panels and access hatches.

Our teams also installed a supervision system for the regulation and control of FFUs, completed all machine integrations, supplied and installed 13 specialized cleanroom doors and 4 fire-rated doors, as well as supplied and installed 9 glazed frames and 150 light fixtures.

VÊPRES thanks CHABANNE ET PARTENAIRES, VISUEL, and ESIEE Paris / CCIR Paris Ile-de-France for their trust and for the excellent working relationship throughout the project.

Large-Scale Projects

In collaboration with CHABANNE ET PARTENAIRES and VISUEL, VÊPRES participated in the creation of a building housing 650 m² of ISO 5, ISO 7, and ISO 8 cleanrooms for ESIEE Paris in Noisy-Le-Grand (93). This project on the Campus de la Cité Descartes involved the construction of large areas with strict technical criteria.

Contact us!

DIAMFAB
DIAMFAB

DIAMFAB

Complete fit-out of the production site for DIAMFAB, an Isère-based startup specializing in the manufacturing of semiconductor synthetic diamonds.

DIAMFAB
HELIUP
HELIUP

HELIUP

Very tight deadlines and technical constraints for this project dedicated to the manufacturing of photovoltaic panels for HELIUP.

HELIUP
SGH MEDICAL PHARMA
SGH MEDICAL PHARMA

SGH MEDICAL PHARMA

This cleanroom, constructed for SGH MEDICAL PHARMA, is dedicated to a single client, a global leader in animal health.

SGH MEDICAL PHARMA
ADRAGOS PHARMA
ADRAGOS PHARMA

ADRAGOS PHARMA

Construction of a new production line for ADRAGOS PHARMA, within a constrained environment and without interrupting operations.

ADRAGOS PHARMA
ELOGEN
ELOGEN

ELOGEN

Three projects, totaling 300 m² and encompassing an assembly line and a laboratory, were completed for ELOGEN, a specialist in electrolyzers producing green hydrogen.

ELOGEN