A large-scale project with a cleanroom of 1,200 m² with many technical challenges.

iso 7 cleanroom ultra clean iso 6 cea ines

Large-scale project: a cleanroom of 1,200 m² in Savoie Technolac

VÊPRES deploys a very high level of technicality for the construction of the infrastructure of thiscleanroomnot only very large (1,200 m²), but also very high (6 meters) and with several zones: ISO 5, ISO 6, ISO 7 and ISO 8.

Study and implementation of the development of a 1,200 m² premises: partitions, ceilings, ducts, FFU, BMS.

The particularities of this room (partitions and ceilings at 6 meters, individual plenums, more than 100 FFUs, an overhead crane) required very competent human resources, qualified to work at height as well as a high vigilance for safety throughout the project.

The teams of VÊPRES would like to thank the CEA INES, located in Technolac in Savoie (73), for its confidence in this very large project.

SGH MEDICAL PHARMA
SGH MEDICAL PHARMA

SGH MEDICAL PHARMA

This cleanroom for SGH MEDICAL PHARMA is dedicated to a single customer, a global player in animal health.

SGH MEDICAL PHARMA
ADRAGOS PHARMA
ADRAGOS PHARMA

ADRAGOS PHARMA

Construction of a new production line for ADRAGOS PHARMA, in a constrained environment and without interruption of activity.

ADRAGOS PHARMA
ELOGEN
ELOGEN

ELOGEN

Three projects with a total surface area of 300 m², including an assembly line and a laboratory, have been completed for ELOGEN, a specialist in electrolyzers producing green hydrogen.

ELOGEN
BECTON DICKINSON
BECTON DICKINSON

BECTON DICKINSON

For Becton Dickinson, VÊPRES has created a QCL laboratory in an existing building, on an area of 600 m².

BECTON DICKINSON
LUMIBIRD - QUANTEL
LUMIBIRD - QUANTEL

LUMIBIRD - QUANTEL

The construction of a cleanroom ISO 8 of 640 m² was completed in less than 8 months for LUMIBIRD.

LUMIBIRD - QUANTEL