Member of the CEME Group

MINATEC Entreprises / CYTOO

Biotech Cleanroom ISO 8

3 months! The challenge was met by the teams working on cleanroom, a laboratory and offices.

biotechnology cleanroom iso 8 minatec cytoo 2

A cleanroom ISO 8 and offices built in 3 months!

3 months! Unrealistic at first sight, but met by VÊPRES , who mobilized its teams and partners to respond favorably as general contractor to the quality and deadline constraints imposed by MINATEC Entreprises for the completion of a 300 m² project, comprising an ISO 8cleanroom , a laboratory and offices.

Design and construction of an ISO 8 cleanroom , a laboratory and offices, with a total surface area of 300 m², including: air treatment, partitions, flooring, fluids, electricity.
Built in the existing MINATEC Entreprises buildings, cleanroom was adapted to the building's ergonomics and process requirements. The air handling unit and technical equipment were installed on the upper level of the building.

The VÊPRES teams would like to thank MINATEC Entreprises and CYTOO SA in Grenoble, Isère (38) for their confidence.

cleanrooms for laboratories Minatec Entreprises

"Quality, reliability, deadlines: a state of mind that rises to the challenge!"

Guy YAGUES, MINATEC Entreprises Manager of New Works and Fittings

Creation of laboratories and cleanrooms for start-ups housed in a high-tech building.

biotechnology cleanroom iso 8 minatec cytoo 1

Main laboratory

Acoustic ceiling, SAS entrance and pass-through

biotechnology cleanroom iso 8 minatec cytoo 3

Other laboratory

Waiting for equipment

biotechnology cleanroom iso 8 minatec cytoo 4

Office zone

Laboratory integrated into the office platform

biotechnology cleanroom iso 8 minatec cytoo 5

Air handling unit

Air handling unit located in the machine room on the upper floor

biotechnology cleanroom iso 8 minatec cytoo 2

Laboratory entrance

Entrance hall serving laboratories and offices

Completed in 3 months

In just 3 months, VÊPRES took on the challenge of building an ISO 8 cleanroom , laboratory and offices for MINATEC Entreprises. The 300 m² project involved the design and construction of all aspects, including air handling, partitions, flooring and electrical installations. The cleanroom was integrated into the existing buildings, with the air handling unit installed on the upper level.

Contact us!

DIAMFAB
DIAMFAB

DIAMFAB

Complete layout of the production site for DIAMFAB, a start-up based in Isère specializing in the manufacture of synthetic semiconductor diamonds.

DIAMFAB
HELIUP
HELIUP

HELIUP

Very tight deadlines and technical constraints for this project dedicated to the manufacture of photovoltaic panels for HELIUP.

HELIUP
SGH MEDICAL PHARMA
SGH MEDICAL PHARMA

SGH MEDICAL PHARMA

This cleanroom for SGH MEDICAL PHARMA is dedicated to a single customer, a global player in animal health.

SGH MEDICAL PHARMA
ADRAGOS PHARMA
ADRAGOS PHARMA

ADRAGOS PHARMA

Construction of a new production line for ADRAGOS PHARMA, in a constrained environment and without interruption of activity.

ADRAGOS PHARMA
ELOGEN
ELOGEN

ELOGEN

Three projects with a total surface area of 300 m², including an assembly line and a laboratory, have been completed for ELOGEN, a specialist in electrolyzers producing green hydrogen.

ELOGEN