3 months! A challenge met by its teams for the construction of a cleanroom, a laboratory, and offices.
An ISO 8 cleanroom and offices completed in 3 months!
3 months! Initially an unrealistic timeframe, but met by VÊPRES, which successfully mobilized its teams and partners to favorably address, as a general contractor, the quality and deadline constraints imposed by MINATEC Entreprises for the execution of a 300 m² project, comprising an ISO 8 cleanroom, a laboratory, and offices.
Comprehensive design and construction of an ISO 8 cleanroom, a laboratory, and offices, totaling 300 m², encompassing: air treatment, partitions, flooring, utilities, and electrical systems.
Implemented within existing MINATEC Entreprises buildings, the cleanroom was adapted to the building's ergonomics and process requirements. The air handling unit and technical equipment were installed on the upper level of the building.
The VÊPRES teams thank MINATEC Entreprises and CYTOO SA, located in Grenoble, Isère (38), for their trust.
« Quality, reliability, deadlines: a mindset that rises to the challenges! »
Guy YAGUES, Head of New Works / Facilities at MINATEC Entreprises
Construction of laboratories and cleanrooms for startups housed in a high-tech building.
Completion within 3 months
In just 3 months, VÊPRES undertook the challenge of constructing an ISO 8 cleanroom, a laboratory, and offices for MINATEC Entreprises. The 300 m² project encompassed the study and execution of all aspects, including air treatment, partitions, floor coverings, and electrical installations. The cleanroom was integrated into existing buildings, with the air handling unit installed on the upper level.