3 months! The challenge was met by the teams working on cleanroom, a laboratory and offices.
A cleanroom ISO 8 and offices built in 3 months!
3 months! Unrealistic at first sight, but met by VÊPRES , who mobilized its teams and partners to respond favorably as general contractor to the quality and deadline constraints imposed by MINATEC Entreprises for the completion of a 300 m² project, comprising an ISO 8cleanroom , a laboratory and offices.
Design and construction of an ISO 8 cleanroom , a laboratory and offices, with a total surface area of 300 m², including: air treatment, partitions, flooring, fluids, electricity.
Built in the existing MINATEC Entreprises buildings, cleanroom was adapted to the building's ergonomics and process requirements. The air handling unit and technical equipment were installed on the upper level of the building.
The VÊPRES teams would like to thank MINATEC Entreprises and CYTOO SA in Grenoble, Isère (38) for their confidence.
"Quality, reliability, deadlines: a state of mind that rises to the challenge!"
Guy YAGUES, MINATEC Entreprises Manager of New Works and Fittings
Creation of laboratories and cleanrooms for start-ups housed in a high-tech building.
Completed in 3 months
In just 3 months, VÊPRES took on the challenge of building an ISO 8 cleanroom , laboratory and offices for MINATEC Entreprises. The 300 m² project involved the design and construction of all aspects, including air handling, partitions, flooring and electrical installations. The cleanroom was integrated into the existing buildings, with the air handling unit installed on the upper level.