Total conversion of 1,200 m² into a packaging area
URIAGE Laboratories needed to fit out the packaging area for their cosmetic products manufactured at the Échirolles site. The project involved the supply and installation of a partitioned unit (walls and ceilings) covering a very substantial total surface area of 1,200 m². It also included the supply and installation of all the glazing, as well as doors to facilitate circulation through the various areas: pedestrian doors and quick-opening flexible doors.
Services provided
- Renovation of packaging facilities for URIAGE laboratories at the Échirolles site
- Supply and installation of a 1,200 m² partitioned wall and ceiling system
- Supply and installation of glazing, pedestrian doors and quick-opening flexible doors
- Free-standing metal structure
- Resin flooring
- Sandwich panel partitioning
- False ceiling in sandwich panels
- Installation of recovery ducts
- SAS with roll-up doors
- Commissioning and cleaning
"With VÊPRES, we share the same values: proximity, responsiveness, agility and boldness."
Franck ANDREU, Director of URIAGE industrial sites
Construction of a 1,200 m² ISO 8 packaging area for URIAGE.
A challenge
every step of the way
This first project with URIAGE was also the first for a local (Grenoble-based) cosmetics laboratory. The main challenge was to meet the deadlines, which were extremely tight given the scope of the work. We were able to meet them thanks to the very rapid validation of the studies and our ability to meet each stage of the schedule, which was a challenge for each of them. Finally, we were able to mobilize enough fitters in a very short space of time to complete the project.
About URIAGE
URIAGE Laboratories
URIAGE dermatological laboratories, based locally (Échirolles), use the benefits of very pure water, filtered by Alpine rocks, the virtues of which have been used in the Uriage-les-Bains spa for over 200 years. Since 1992, the laboratories have relied on their dermatological expertise to promote their products internationally (in over 70 countries).
Large-scale project with tight deadlines
Complete refurbishment of a 1,200 m² packaging area for the URIAGE laboratories in Échirolles. The project included the supply and installation of partitions (walls and ceilings), glazing and doors to facilitate circulation. Despite very tight deadlines, the project was successfully completed thanks to rapid validation of the studies and rapid mobilization of the necessary resources.